The Clock House Brick Company Ltd was founded c.1933 to exploit a rich deposit of high-quality Weald Clay to the south of the Surrey village of Capel. The outbreak of war in 1939 was bad news for brickmaking, as housebuilding effectively ceased and the workforce was swallowed up by conscription. Although there was some demand for bricks to be used in military engineering projects, there was little use for the high-grade ceramic blocks made at Clock House. By 1941, the Company was in liquidation and sold the majority of its share capital to the London Brick Company (LBC) to avoid closing the works. In 1945, the Company was wound up for good and the works were acquired by the LBC. Under LBC, production was substantially increased to meet demand from the recovering housing market and in the 1960s the factory was rebuilt to accommodate more efficient production methods.

London Brick was acquired by Hanson PLC in 1984 and the works was refitted shortly afterwards to produce multi stock bricks under the Butterley and Capel brand names. In 1998, Clockhouse Bricks were used by three major exhibitors in that year's Ideal Home Show and by 2000, Clock House was Hanson’s main soft mud production site, making around 42 million bricks per year.

Just eight years later, the global financial crisis hit the building materials industry, hard: a sudden slump in housing prices meant that house-building ground almost to a halt and the demand for bricks plummeted. In March 2009, Hanson announced a 'phased closure programme' which began immediately, leading to the loss of 61 jobs. Hanson have since indicated that there is no intention to re-activate the brickworks or extract clay from the adjacent pits. Since closure, Clock House Brickworks has been in limbo, slowly being stripped of anything valuable while a lengthy audit determines the planning conditions surrounding re-use of the site. Plans for an incinerator ('energy from waste facility') on the site, bitterly opposed by local residents, were thrown out by a High Court Judgment in 2009 and the future of the site is now uncertain.
867797


867798


867799


867800


867801


867802


867803


867804


867805
 

Calamity Jane

i see beauty in the unloved, places & things
Regular User
Good report. Covered the place well. Do you know its current status? as this was 5 yrs ago. Youve sat on this a while, good for you :thumb
 

Calamity Jane

i see beauty in the unloved, places & things
Regular User
The whole of the building is stripped out now, there's nothing in it.
Cheers Mooks, I like to know updates on places. Not for visiting, as I like to find new places, I do some already on here. But updates just help everyone, so cheers
 

Tommoore

28DL Member
28DL Member
Good report. Covered the place well. Do you know its current status? as this was 5 yrs ago. Youve sat on this a while, good for you :thumb
i go here often with my friends, its even my profile pic, all the machinery is no longer there it must have been removed a couple years back but its still a fun place to visit, just a huge empty warehouse and some other building round the back we managed to get into. there's a metal scaffolding ladder we use to get over the fence so accessibility is no trouble. i have quite alot of videos and pictures of the place just not really report worthy.
 
Top