The history...

In 1867, the city prohibited the use of Bradford Beck water in the canal, which soon ran dry. The Beck’s only real utility to the town was now as a main sewer, and in that capacity the stream served as the depository for all of the town’s waste. Even when sewer pipes had first been installed in Bradford, in the mid-19th century, they merely dumped the (untreated) sewage directly into the Beck, to the deep unhappiness of downstream landowners on both the Beck and the Aire. In 1869 one of these landowners, a William Stansfield of Esholt Hall, obtained an injunction mandating that Bradford treat its sewage before releasing it into the river. The first treatment plant proved to be a failure as the grease from the wool mills made the sewage exceptionally difficult to treat, but continued injunctions forced the city to continue investing in treatment facilities. Ironically, in 1899, the city took over William Stansfield’s Esholt estate on the Aire for a new treatment plant, and the Esholt Sewage Works continues to be Bradford’s main treatment plant today. In the 1920s, the three-mile Esholt Sewage Disposal tunnel was dug to directly connect the city’s sewer system to the Esholt works, and the Bradford Beck was finally freed of its sewerage burden. By this time, however, the river had already been completely culverted through the center of town, and so few fully appreciated the change that had taken place


The mission...

This site is MASSIVE, and we still didn't cover it all!! We started at the north of the site from the old primary settlement tanks which are no longer in use. We travelled along the top of the shit pipes, across the River Aire to the main site. The building in the distance is the incineration plant.

5374344834_7e134df91e_b.jpg


5373745703_1fcb5c5ec3_b.jpg


5373745907_b28430f18b_b.jpg



Behind the incineration plant is some kind of poo silo

5374345446_9d3ae7402d_b.jpg



Then we moved onto the best bit of the site, part of Yorkshire Water's £39m upgrade of the works. The upgrade has seen the 100-year-old secondary treatment plant replaced by new 'activated sludge' process tanks. Basically, HUGE vats of constantly whirling gurgling poo being biologically broken down!!

Some sexy industrial pipe dreams going on though

5374345556_6e94aef6b6_b.jpg


5374345736_f0d3c6224d_b.jpg


5373746641_6bcb452dba_b.jpg


5373746819_f59d7b3ff1_b.jpg


5373747031_93149b261b_b.jpg


5373747199_447d30c29d_b.jpg


5374346648_6459015eb1_b.jpg



HUGE tanks of steamy poo's being churned and broken down. Aromatic?... Quite

5374347118_4062b2e392_b.jpg


5373747541_05004e12ff_b.jpg


5374346942_50217bfd6f_b.jpg



Yours truly

5374348240_54a6f87226_b.jpg
 
Top