real time web analytics
Video Report - - Kettleness and Sandsend railway tunnels, complete walkthrough. | Underground Sites | 28DaysLater.co.uk

Video Report - Kettleness and Sandsend railway tunnels, complete walkthrough.

Hide this ad by donating or subscribing !

RetroGamerVX

28DL Full Member
28DL Full Member
Hi,

I and a few of the local explorers have completed a complete walkthrough of Kettleness and Sandsend railway tunnels and videoed the entire walk. We also look at some of the surround alm quarries.

Following info curtsey of Forgotten Relics :

Like its sibling neighbour Kettleness, Sandsend is a tunnel which never should have been. When the Whitby, Redcar & Middlesbrough Union Railway began work on its Loftus-Whitby route in 1871 - five years after obtaining its enabling Act - the plan was to build the line along the edge of the cliffs. Work ground to a halt in 1874 when the contractor went into liquidation; when it resumed under the auspices of the North Eastern Railway, the original formation was deemed too dangerous - some of it having collapsed into the sea - and the track was re-routed via two tunnels further inland. The line opened with little ceremony on 3rd December 1883.

Sandsend, by far the longer of these tunnels, is 1,652 yards in length and was built to accommodate a single line, falling to the south on a gradient of 1:57. It is predominantly straight but the last ~350 yards incorporate a curve to the north of around 32 chains radius. It boasts five shafts, all of which are capped. No evidence of them is visible above ground. Shafts 2 and 4 are of a tighter diameter and were built to service the tunnel's construction. At their bases are adits which were driven out to the cliff-face, allowing spoil from the workings to be tipped onto the shore for clearance by the sea. The three wider shafts were added in 1900.

The northern portal was always problematic and had been strengthened using rings of bullhead rail. Unfortunately these could no longer take the strain and around 6 feet of the roof collapsed at the portal early in 2008, 51 years after the last train passed through it.

Regards,

Steve
 

RetroGamerVX

28DL Full Member
28DL Full Member
if it's Port Mulgrave use a 4 gas, an absolute priority.
Yep, we didn't go past the first collapse, just look down the first part of the right hand tunnel, do some clearing. The video is going to be covered in warnings and we will use it to educate on the dangers of sites like this.
 
Top