Longannet power station was a large closed coal-fired power station in Fife. It was the last coal-fired power station in Scotland. It was capable of co-firing biomass, natural gas and sludge. The station is situated on the north bank of the Firth of Forth, near Kincardine on Forth.
Its generating capacity of 2,400 megawatts was the highest of any power station in Scotland. The station began generating electricity in 1970, and when it became fully operational it was the largest coal-fired station in Europe. At the time of closure it was the third largest, after Bełchatów in Poland and Drax in England, and the 21st most polluting.
After failing to win a contract from National Grid, Longannet closed on 24 March 2016.[3][4] The station was opened in 1973 and operated by the South of Scotland Electricity Board until 1990 when its operation was handed over to Scottish Power following privatisation.
The station is a regional landmark, dominating the Forth skyline with its 183 m (600 ft) chimney stack. Longannet lacked cooling towers, having instead used water from the River Forth for cooling.
History
The station was designed by Scottish architects Robert Matthew, Johnson Marshall & Partners. Consulting Engineers were Merz and McLellan. Construction began in the mid-1960s, 4 km (2.5 mi) downstream of the existing Kincardine power station. The station was constructed on 30 hectares (74 acres) of land reclaimed from the Firth of Forth using ash from the Kincardine station. It began generating electricity in 1970, with a design lifetime of 30 years, and was in full operation by 1973. At the time of its completion, the station was the largest in Europe.
The facility was operated by the South of Scotland Electricity Board until 1990 when the electricity industry in the UK was privatised. After that it was operated by Scottish Power, a subsidiary of Iberdrola. It paid £40m per year in connection charges to National Grid due to its distance from South England.
The plant opted in to the UK Transitional National Plan, placing limits on its sulphur dioxide, nitrous oxides and particulates emissions. The plant tested additional technologies that could have permitted it to operate beyond 2020 under the EU Industrial Emissions Directive. The station closed on 24 March 2016.
And that's pretty much where it finished, when the security guard walked in on us.
Its generating capacity of 2,400 megawatts was the highest of any power station in Scotland. The station began generating electricity in 1970, and when it became fully operational it was the largest coal-fired station in Europe. At the time of closure it was the third largest, after Bełchatów in Poland and Drax in England, and the 21st most polluting.
After failing to win a contract from National Grid, Longannet closed on 24 March 2016.[3][4] The station was opened in 1973 and operated by the South of Scotland Electricity Board until 1990 when its operation was handed over to Scottish Power following privatisation.
The station is a regional landmark, dominating the Forth skyline with its 183 m (600 ft) chimney stack. Longannet lacked cooling towers, having instead used water from the River Forth for cooling.
History
The station was designed by Scottish architects Robert Matthew, Johnson Marshall & Partners. Consulting Engineers were Merz and McLellan. Construction began in the mid-1960s, 4 km (2.5 mi) downstream of the existing Kincardine power station. The station was constructed on 30 hectares (74 acres) of land reclaimed from the Firth of Forth using ash from the Kincardine station. It began generating electricity in 1970, with a design lifetime of 30 years, and was in full operation by 1973. At the time of its completion, the station was the largest in Europe.
The facility was operated by the South of Scotland Electricity Board until 1990 when the electricity industry in the UK was privatised. After that it was operated by Scottish Power, a subsidiary of Iberdrola. It paid £40m per year in connection charges to National Grid due to its distance from South England.
The plant opted in to the UK Transitional National Plan, placing limits on its sulphur dioxide, nitrous oxides and particulates emissions. The plant tested additional technologies that could have permitted it to operate beyond 2020 under the EU Industrial Emissions Directive. The station closed on 24 March 2016.