Longannet power station was a large closed coal-fired power station in Fife. It was the last coal-fired power station in Scotland. It was capable of co-firing biomass, natural gas and sludge. The station is situated on the north bank of the Firth of Forth, near Kincardine on Forth.

Its generating capacity of 2,400 megawatts was the highest of any power station in Scotland. The station began generating electricity in 1970, and when it became fully operational it was the largest coal-fired station in Europe. At the time of closure it was the third largest, after Bełchatów in Poland and Drax in England, and the 21st most polluting.

After failing to win a contract from National Grid, Longannet closed on 24 March 2016.[3][4] The station was opened in 1973 and operated by the South of Scotland Electricity Board until 1990 when its operation was handed over to Scottish Power following privatisation.

The station is a regional landmark, dominating the Forth skyline with its 183 m (600 ft) chimney stack. Longannet lacked cooling towers, having instead used water from the River Forth for cooling.

History

The station was designed by Scottish architects Robert Matthew, Johnson Marshall & Partners. Consulting Engineers were Merz and McLellan. Construction began in the mid-1960s, 4 km (2.5 mi) downstream of the existing Kincardine power station. The station was constructed on 30 hectares (74 acres) of land reclaimed from the Firth of Forth using ash from the Kincardine station. It began generating electricity in 1970, with a design lifetime of 30 years, and was in full operation by 1973. At the time of its completion, the station was the largest in Europe.

The facility was operated by the South of Scotland Electricity Board until 1990 when the electricity industry in the UK was privatised. After that it was operated by Scottish Power, a subsidiary of Iberdrola. It paid £40m per year in connection charges to National Grid due to its distance from South England.

The plant opted in to the UK Transitional National Plan, placing limits on its sulphur dioxide, nitrous oxides and particulates emissions. The plant tested additional technologies that could have permitted it to operate beyond 2020 under the EU Industrial Emissions Directive. The station closed on 24 March 2016.

40907227933_7613f9a024_c.jpg


48056586338_02cbd5d7d2_c.jpg


48056705121_645579d9a2_c.jpg


48047708786_d9e9cdde61_c.jpg


48056671853_3d2a9b390b_c.jpg


48047744048_d90ba53d29_c.jpg


48056725437_955b1c24ae_c.jpg


48047719456_e3131432f3_c.jpg


48056669271_310c9dfabe_c.jpg


48056733033_5f3b8c70ac_c.jpg


48056728708_1f6d9cb107_c.jpg


48056788472_da32e313f6_c.jpg


48056828557_1280bc6c95_c.jpg


48056785463_4a69c6579f_c.jpg


48056848392_ff94d20a58_c.jpg


48056794613_571472d983_c.jpg


48056774073_4c7548343b_c.jpg


48056828223_0275a770f6_c.jpg


48056755271_e6384a6bb1_c.jpg


48056837707_af0cd2ec40_c.jpg


48056763241_d1dd0619a3_c.jpg


48056820152_5b13ddb058_c.jpg


48056823503_e6c42a37fd_c.jpg


And that's pretty much where it finished, when the security guard walked in on us.
 

Exploring with Andy

Behind Closed Doors
Staff member
Moderator
Wow you did well to get away with that! Glad you got away ok though. And managed to get some good pics first too
 

tigger

mog
Regular User
Wonderful stuff. Nicely recorded. The modern control rooms are so boring in comparison
 