anybody which has read my threads on SSI,
will know that I have been to each part of the site (well 92% of it).
So it would be rude of me if I didnt put a thread on the vast conveyor network,
considering I did spent alot of time in them & became ill in the process.
They are absolutley filthy with coal dirt & particles everywhere,
exits & mid way points are sealed with corrugated while the steps have been severed.
Theres no electricity, except some of the main conveyors.
SSI Conveyor Network by stranton
The first stage is the production of coke,
this conveyor carries coal from the coal heaps to the ovens which will be turned to coke.
Once the procedure is complete, this conveyor carries coke to the ore blending & feed.
The second stage is the production of sinter,
this conveyor carries iron ore, scrap steel & lime from the wharf to the furnace which will be turned to sinter
Once the procedure is complete, this conveyor carries nodules or pelets to the ore blending & feed.
Main conveyor to the ore blending & feed
The ore blending & feed to the blast furnace bunker,
carries & stores coke & nodules or pelets prior to loading on the blast furnace conveyor
This conveyor carries coke & nodules or pelets,
from the blast furnace bunker to the blast furnace which will be turned to steel.
The conveyors arnt a straight route from the coke ovens & sinter works to the blast furnace,
there are several sections some above & some below connected with drop towers or bunkers.
Most of the conveyors are 1 or 2 lines, while a
percentage are 3 & 4 lines esp the ore blending & feed.
The conveyors at the wharf which deal with the imported coal,
carries the coal from the wharf to the coal heaps at the coke ovens & sinter works.
Processing unit
The miles of conveyors for distributing coal & coke, nodules or pelets about the site,
the main conveyor is a straight 1 mile long.
Coke ovens conveyors
Sinter works conveyors
All these conveyors lead from the coal drops or to the ore blending & feed
then to the blast furnace,
The main walkway from the blast furnace to the offices,
no conveyors but theres simularities with the corrugated design.
thanks
will know that I have been to each part of the site (well 92% of it).
So it would be rude of me if I didnt put a thread on the vast conveyor network,
considering I did spent alot of time in them & became ill in the process.
They are absolutley filthy with coal dirt & particles everywhere,
exits & mid way points are sealed with corrugated while the steps have been severed.
Theres no electricity, except some of the main conveyors.
SSI Conveyor Network by stranton
The first stage is the production of coke,
this conveyor carries coal from the coal heaps to the ovens which will be turned to coke.
Once the procedure is complete, this conveyor carries coke to the ore blending & feed.
The second stage is the production of sinter,
this conveyor carries iron ore, scrap steel & lime from the wharf to the furnace which will be turned to sinter
Once the procedure is complete, this conveyor carries nodules or pelets to the ore blending & feed.
Main conveyor to the ore blending & feed
The ore blending & feed to the blast furnace bunker,
carries & stores coke & nodules or pelets prior to loading on the blast furnace conveyor
This conveyor carries coke & nodules or pelets,
from the blast furnace bunker to the blast furnace which will be turned to steel.
The conveyors arnt a straight route from the coke ovens & sinter works to the blast furnace,
there are several sections some above & some below connected with drop towers or bunkers.
Most of the conveyors are 1 or 2 lines, while a
percentage are 3 & 4 lines esp the ore blending & feed.
The conveyors at the wharf which deal with the imported coal,
carries the coal from the wharf to the coal heaps at the coke ovens & sinter works.
Processing unit
The miles of conveyors for distributing coal & coke, nodules or pelets about the site,
the main conveyor is a straight 1 mile long.
Coke ovens conveyors
Sinter works conveyors
All these conveyors lead from the coal drops or to the ore blending & feed
then to the blast furnace,
The main walkway from the blast furnace to the offices,
no conveyors but theres simularities with the corrugated design.
thanks