The history :
Opened 1876
Closed 1956
971 yards long.
Work on Withcall Tunnel got underway in January 1852 with the driving of a 10 foot heading through sandstone and chalk.
The Louth & Lincoln Railway’s original plan was for a bore of 803 yards but this was extended to 971 yards when a...