Visited with Nic81, had a spare hour or so on a Saturday afternoon, before retiring to the local pub which is next to the culvert
History...
Concrete culvert constructed between 1907-1911 carrying the Ouseburn underneath the suburb of Heaton. Runs for a total length of 2150 ft and built at a cost of £23,000. The south end lies underneath Ouseburn Viaduct, some of which has been paved over and is used for horse riding.
Cheers fir viewing
History...
Concrete culvert constructed between 1907-1911 carrying the Ouseburn underneath the suburb of Heaton. Runs for a total length of 2150 ft and built at a cost of £23,000. The south end lies underneath Ouseburn Viaduct, some of which has been paved over and is used for horse riding.
Cheers fir viewing