real time web analytics
Report - - CIAC Middleshaven - Middlesbrough - Feb 2011 | High Stuff | 28DaysLater.co.uk

Report - CIAC Middleshaven - Middlesbrough - Feb 2011

Hide this ad by donating or subscribing !

Horus

Butt Wipe
28DL Full Member
CIAC Middlehaven - Middlesbrough - Feb 2011

CIAC Middlehaven

Visted: Forsaken, Horus

sugar-cubes1-copy.jpg


Phase One of Middlehaven, the bold new concept for Middlesbrough’s redundant dock area, comprises an eight storey mixed use building called ‘Community in a Cube’ (CIAC). Built on the edge of the Middlehaven Dock and over challenging existing ground conditions. CIAC comprises sections extracted from its form within a structural sway frame. The substructure of the building has challenging aspects as CIAC straddles the historic, buried dock wall beneath. One Planet Living aspirations are at the forefront of the design to produce a legacy that includes exposed concrete soffits to deliver thermal mass, roof gardens and rain water harvesting.

Client:
Bioreginal Quintain Ltd

Contract Value:
£10.5 million

Contract Period:
March 2010 - September 2011


Pictures..

1.
IMG_0030.jpg


2.
IMG_0027.jpg


3.
IMG_0025.jpg


4.
IMG_0023.jpg


5.
IMG_0021.jpg


6.
IMG_0018.jpg


7.
IMG_0012.jpg


8.
View from Crane
IMG_0009.jpg


9.
View from Crane
IMG_0008.jpg


10.
View from Crane
IMG_0007.jpg


11.
View from Crane
IMG_0005.jpg


12.
View from Crane
IMG_0002.jpg



Sorry for those blury pictures, my tripod iv bought is very light and sensitive to any type of wind, need another one

Thanks for viewing​
 
Last edited:

Who has read this thread (Total: 7) View details

Top