real time web analytics
Report - - Grim Resistor, Bolton - Jan 14 | UK Draining Forum | 28DaysLater.co.uk

Report - Grim Resistor, Bolton - Jan 14

Hide this ad by donating or subscribing !

concreteJungle

28DL Regular User
Regular User
I'd read about an abnormally large sewer pipe (for Bolton's system) so went for a look with TheVicar. After dropping down a couple of landings we found ourselves at the downstream end of a 2.1m tall, 300m long storage tunnel. All manner of crap had washed down to this end and produced a winter wonderland of filth.

11894358314_83c0b4fc12_b.jpg


11894359884_b94510b500_b.jpg


Further upstream the tunnel became clearer, after a few large manhole shafts we came to the end.

11893954775_f23774964a_b.jpg


A small sewer entered from a dropshaft and there was an overflow higher up for when the tunnel backfills (due to a very small throttle pipe) which goes straight to Bolton's outfall sewer.

11895993984_986f10debb_b.jpg


11894230443_f1c1aec69f_b.jpg
 
Top