Visited with Ashley.
Thought this one should go Non-Public after the recent crackdown on Security across all of the Imerys China Clay sites in the Plymouth area.
I had a look around here before with Urbanity and Dangerous Dave, and the security were very relaxed. Now there is a new 8 foot fence around the entire compound, new taller metal gates at the main entrance and a series of mobile patrols.
We got about half way through the site before a very close shave with the Security Guards. As the light was fading we decided to call it a night and return another day.
Anyway, onto the Photos.
The approach
Pipe-work
Settling Tank
Conveyers
Halloysite
Dried Clay stores
Advisory-Sign FAIL
Conveyer Bridge
Packed Clay
The Clay Sheds
Thought this one should go Non-Public after the recent crackdown on Security across all of the Imerys China Clay sites in the Plymouth area.
I had a look around here before with Urbanity and Dangerous Dave, and the security were very relaxed. Now there is a new 8 foot fence around the entire compound, new taller metal gates at the main entrance and a series of mobile patrols.
We got about half way through the site before a very close shave with the Security Guards. As the light was fading we decided to call it a night and return another day.
Anyway, onto the Photos.
The approach
Pipe-work
Settling Tank
Conveyers
Halloysite
Dried Clay stores
Advisory-Sign FAIL
Conveyer Bridge
Packed Clay
The Clay Sheds