CYM Coke Works​
Iv'e been a bit lax on the exploring front of late so when a suggestion of Welsh derps came up i deceided to dust off the Nikon.
Was totaly unprepared for this going in my shorts and trainers and without gloves and an early start didnt make me a happy bunny.
Visited with Spanners and Rustproofhawk.
Didn't see any men with dogs,the pallisade looked prety new ?

9709579614_527493b72f_b.jpg


Cym Coke works was part of the NCB's coal products division but in the mid 70's it was transfered to a new company...."National Smokless Fuels ltd".It produced Foundary coke.
Three varieties of coal were blended ,including that from the adjacent Cym Colliery,which was washed at Cym washery

View From the slag heap,Beddau to the left

9709200420_2f7aa029f6_c.jpg


The Blending plant had a capacity of 4,500 tons in 4 bunkers and the service bunker had a capacity of 3000 tons

9709269734_e23b3dce5a_c.jpg


After blending the coal went into the ovens . Coking time was 26hrs producing coke with a moisture content of 6-8%.Output was 1530 tons/day

9706071133_6e548c4338_c.jpg


9706066107_bf97a437e0_z.jpg
9706063171_0396604794_z.jpg
9709290042_ef8a3895e1_z.jpg


The coke was then passed through 2x 160 ton per hr hammer mills,then passed to 5x50 ton bunkers for loading.

9705981641_7be28e1037_z.jpg
9706004775_0991ff030f_z.jpg



By product from coking was gas.The capacity of the by products plant was 700000 cubic feet a day of gas.
Foull gas from the top of the ovens was drawn off by primary condensors and exhausters,2 xturbine driven exhausters were used taking steam at 120psi and 600 degf,exhausting at 23psi.The gas was passed to detarers where the tar was removed by electrostatic methods.This tar was snet to Caerphilly Tar distilation plant for processing into pitch

The gas then went to the salt house where ammonium sulphate was produced.The gas then passed to benzole scrubbers and then off to the fan house,some of the remaining foul gas was flared off.


9709280214_4a0dfc0e22_z.jpg
9706022157_7e78dc9ceb_z.jpg



The boilers operated at 810 degf and a pressure of 428psi,2 GEC double passout turbo generators took steam at 400psi 800 degf....the first passout was 130psi and trhe 2nd 25 psi.The system generated 11KV ,the power went to the mine at 3.3KV to the coke works and the SWEB grid,a 3.3KV substatuion was located at the de-tarers which also supplied the hammer mills and compressors.
9706084667_2810c28b89_z.jpg
9709356728_bc5a9e074d_z.jpg
9705959609_11b0669384_z.jpg




Unfortunatly we didnt get to see a fair bit of the site,the famous Welsh weather appeared and we made a hasty retreat to the car passing nutters riding scramblers up the slagheaps. :)
Thanks for looking
Pirate


a few more here : Cym Coke Works,Beddau Wales - a set on Flickr
 